PROJECT

Warmingham – United Kingdom

Location Details

Gallery

NAME OF THE WATERWAY

Wheelock

LOCATION

Warmingham

AREA

Cheshire East

HEAD

 1.9 m

FLOW

 900 l/sec

SETUP

12 kW

This 12kW VEP will save around 17,000kg CO2e/year by producing ~35,000kWh of renewable electricity. 

 

PROJECT

Warmingham – UK

Location Details

NAME OF THE WATERWAY

River Wheelock

LOCATION

Warmingham

AREA

Cheshire East

HEAD

1.9 m

FLOW

900 l/sec

SETUP

12 kW

Gallery

This 12kW VEP will save around 17,000kg CO2e/year by producing ~35,000kWh of renewable electricity.